Cost: 5 million USD.
Client: BAB ENERGY VE PETROL URUNLERI AS, a private enterprise.
 

Our company's tasks include stripping and soil removal into a waste dump with a total volume of 2 million cubic meters.

Multidisciplinary filling station in Tashkent region along the international route Tashkent-Fergana equipped with new modern compressor equipment produced by the South Korean company Kwan Shin, the productive capacity of 4 500 m3 / 1 hour.