News
27.04.2010
ROADMAX LLC was successfully handed over with amount of executed works

«ROADMAX» LLC was successfully handed over with amount of executed worksfor April, for the sum 300 mln. soums, that makes 100 % of works, in conformity of the schedule of...

29.03.2010
ROADMAX LLC is appointed as a general constructer

On the basis of the minute of the Cabinet № 05/1-922 from March29th, 2010 "ROADMAX" LLCis appointed as a general constructeron object «Construction of the...

15.01.2010
Iit has been held an assembly of Cabinet of RUz in Nukus.

During assembly the decision on creation of the design-budget documentation and inclusion in the address list of payments of 2011 construction of a highway by extent of 16 km from...

Prev   4 5 6 7 8 9 10 11 12 13 14 15