Excavation of rocks with blasting works at Pskom HPP 2018. Cost: 4,6 million USD - Photo gallery
01. 01. 2018.

Excavation of rocks with blasting operations with the construction of an access road at the facility in the Bostanlyk district, Tashkent region.

Customer: “UZBEKGIDROENERGO” SJSC
Contractor: “ROADMAX” LLC Uzbekistan
Financing: “UZBEKGIDROENERGO” SJSC
Chief project engineer: “UZBEKGIDROENERGO” SJSC
Period of completion: 2018 y.

The facility is a brown blasting works with excavation of rocks 1 and 2 categories of soil in a volume of 820 thousand m3. As well as the construction of the “Ditch of the terminal structure of the SHPP with an access road” with a length of 12 km. The objectives of our company include: Conducting drilling and blasting works, excavation of hard rocks and soil rocks of 1 and 2 categories of complexity, the construction of an access road. The special equipment of the Atlas Copco Drilling Rig of Pit Ureg series is used. The order and the scope of work were carried out qualitatively on time. The order and scope of work performed qualitatively on time.