A/R 100 km Surhandarya 2012-2014.

Reconstruction of a/r and transition from 2-way to 4-way lane asphalt-concrete pavement, length of 100 km on a/r M39 Tashkent-Termez on areas 1330-1395 km, 1400-1410 km and 1426-1451 km, including 36 bridges.